Crescent Arts Centre

Client

Crescent Arts Committee

Value

£1,025,000

Main Contractor

Gilbert–Ash N.I. Ltd

Architect

Hamilton Architects

Consultant Engineer

Bennett Robertson Design

Quantity Surveyor

Clarke Shipway

Service

M&E Contracting

Duration

18 months

Description


This contract involved the complete refurbishment of the interior of the Victorian listed 4 storey Crescent Arts Centre and the preservation of the exterior façade.

The centre, completed on time in March 2010, provides social facilities for the local community and consists of multipurpose areas, galleries, cafe, dressing rooms, workshop areas, dance studio, shower/WC facilities, general amenities and offices.

As a Listed building, the structural complexity along with restricted service void availability meant that co–ordination and integration of mechanical and electrical installations was paramount in returning an architecturally satisfying and maintainable building, whilst preserving the building elements required by the heritage committee.

 

Systems Installed

• Stage Lighting & Sound Systems

• Lighting

• General Power

• PA and Stand Alone Sound Systems

• Cat 6 Data / Telephone Wiring Network

• Access Control System

• Automatic / Disabled Door Installation

• CCTV

• Intruder Alarm System

• Panic Attack System

• Fire Alarm System

• Mechanical Wiring

• Disabled Refuge System

• Photo Voltaic Panels

• LPHW Heating

• Air Conditioning

• Comfort Cooling

• Ventilation

• Local Extract

• Gas

• Plumbing

• Sanitary Ware

• BEMS / Automatic Controls

 

 

 