Lyric Theatre
Client | Lyric Theatre |
Value | £2,200,000 |
Main Contractor | Gilbert–Ash NI Ltd |
Architect | O’Donnell & Tuomey Architects |
Consultant Engineer | IN2 Engineering Design Partnership |
Quantity Surveyor | Rider Levett Bucknall |
Service | M&E Contracting |
Duration | 17 months |
DescriptionVaughan were awarded the Mechanical and Electrical building services works on the 4,300m2 redevelopment of the prestigious new Lyric Theatre in Belfast. The total construction cost was £19million. It was completed on time and opened to the public in May 2011.
| Systems Installed• Ventilation • Heating • Soils & Waste • Hot and Cold Water • Gas • Rainwater • Sanitary ware • Dry riser • Smoke extract • Heat Exchange Borehole • Fire Alarm • Cable containment • CCTV • Intruder Alarm • Access / video intercom • IT structured cabling • General power • Main Switchboard • Lighting • Emergency Lighting • Theatre works: production lighting, working lighting, sound & communication services • Lightning protection • 2 way disabled refuge call points • Theatre Containment
|