Forster Green Hospital
Client | Greenpark Healthcare Trust |
Value | £3,100,000 |
Main Contractor | Farrans Construction |
Architect | McAdam Design |
Consultant Engineer | Williams & Shaw |
Quantity Surveyor | Farrans Construction |
Service | M&E Contracting |
Duration | 11 Months |
DescriptionVaughan Engineering Services Ltd secured the M&E services work package with Farrans Construction on 3 concurrent contracts at Forster Green Hospital. Vaughan completed the M&E works at the Child and Family Centre, a purpose built building erected at the Forster Green Site, physically connected to the new Adolescent Mental Health Inpatient Unit. We were responsible for coordinating of services throughout building including designing and providing all necessary steelwork supports and brackets associated with the electrical and mechanical installation. The final stage of the works was to supply M&E services at the Learning Support Centre. The works were carried out in a controlled manner as agreed with the main contractor. We undertook the coordinating of sub–contractors works and programming of works as necessary.
| Systems Installed• Main Switchboard • LV Switchgear and Submains Cabling • General Lighting • Emergency Lighting • General Power • Fire alarm and detection • CCTV • BMS Control Wiring • Nurse Call System • Staff Attack Installation • Security System Installation • Lightning Protection • IT Installation • Intruder Alarm • Door Access • Voice and Data Installation • Lightning Protection • Containment Installation • Underfloor Heating • Sanitary Ware • BMS • Air Conditioning • Plumbing • Gas Detection • Ventilation • LTHW • Fire Hydrant Main • Soils and Waste • Fire Suppression • Natural Gas • Thermal Insulation • Solar Water Heating
|