Sheraton Grand Hotel and Spa Edinburgh

Client

Starwood Hotels

Value

£4,500,000

Main Contractor

Ogilvie Construction Limited

Architect

NGP Architects

Consultant Engineer

Wallace Whittle

Quantity Surveyor

Currie and Brown

Service

M&E Services

Duration

9 Months

Description


As the flagship for the refurbishment programme this project involves the complete refurbishment of 256 bedrooms completed in a phased manner to avoid any disturbance to hotel guests.

This fast track programme, timed to coincide with the anniversary celebrations of the hotel chain, also includes the rebuild of some rooms to represent the current needs of the hotel for presidential status rooms.

Given that this hotel is rated at five stars, the standard of the fixtures and fittings represents today’s highest standards in terms of ambiance lighting controls, environmentally friendly comfort cooling and quality bathroom fixtures.

The works on this project were carried out whilst still allowing the hotel to operate at no less than 50% capacity.

Systems Installed

• Video Entry Systems
• Comfort Cooling
• Sprinkler Alterations
• Fire Alarms
• Main Switch Board Replacement
• Small Power Installation
• Data Systems
• Ventilation
• Lighting Control Systems

Vaughans - Sheraton Grand Hotel and Spa Edinburgh

Sheraton 1 sheraton2